The construction would be simpler if the water arrived exactly at the same time.

It’s not.

The amount of waste that enters a residential water system is subject to change throughout the day. Industrial and commercial facilities could encounter operating peaks. Stormwater conditions can change dramatically with the weather. Demand for clean water can also change according to the type of application.

Image credit: romtecutilities.com

As a result, designing a pump station isn’t simply a matter of identifying one flow number and selecting equipment capable of meeting it. Engineers should be aware of the environmental conditions that the system will be subject to.

Consider the Operating Conditions and not only the maximum Capacity

It is clear that the maximum flow is a crucial factor however, it’s just a part of the operation of a station. Imagine that a wastewater treatment system was designed to handle a huge flow at peak. Typically the flows coming in can be much lower. During normal operating hours the station should be able to function properly.

This raises questions such as wet-well sizing and the size of the pump as well as control conditions for head, how to adapt equipment when demand shifts.

A properly engineered package pumping system brings these factors together around the actual requirements for the particular site, rather than considering the maximum capacity of the pump as the entire design objective.

The rhythm of daily wastewater

In the course of the lifecycle of a wastewater lift station the conditions of the influent can change.

The station should have a control strategy that allows the system to activate the pumps and then collect the water. The process involves structural dimensions pumps, valves, pumping gear and piping as well electrical components.

Design can also include other site-specific considerations. Romtec Utilities will incorporate any extra systems, including grinders, vaults and odor control devices when needed. It is more cost-effective to create an entire station around a particular project rather than using an identical configuration to every wastewater site.

Stormwater Changes More Rapidly

Stormwater offers a different kind of operating environment. When it is dry it is possible that a stormwater lift facility may not see much use. But during the most severe weather conditions, the station is likely to experience a significant increase in the amount of activity. It could be part of a flood control plan or even a detention, treatment or drainage plan.

Romtec Utilities evaluates factors including required flow rates as well as head conditions, size of the system as well as site requirements and environmental aspects when developing the systems.

A station serving a commercial project could, therefore, appear very different from one designed for a municipal stormwater application.

Both head conditions and flow are crucial.

The problem of moving 1,000 gallons not the only challenge for engineers. Engineers need to know the direction of that water and the amount of resistance it will encounter.

Elevation changes, piping configuration discharge conditions, and many other characteristics of the system contribute to the head conditions that pumps function.

The connection between flow rate and head is one reason that choosing a motor solely on its capacity does not work. The pump technology and the station’s configuration should be aligned to the hydraulic requirements for the whole application.

Create a design that is based on the conditions the station will experience

Romtec Utilities develops customized pumping systems for stormwater, wastewater cleaner water boosters, industrial and many other uses. The process starts with initial design, budgeting, plan sets along with system components, documentation, starting and testing.

The fundamental principle of engineering is that a real pumping systems don’t work under the same set of conditions.

They have to contend with changing flows, changing demand, and the specific requirements of each project. This fact must be taken into account when designing a successful station.